cv no: 170070 whatsapp mobile: +971504753686 phone +97143970978 e-mail: [email protected] mena professional qualificat

CV NO: 170070

Whatsapp Mobile: +971504753686 Phone +97143970978 E-mail:
[email protected]
MENA
PROFESSIONAL QUALIFICATION
*
Bachelor of CIVIL Engineering
Faculty of Engineering, Alexandria University, Egypt (June. 2008)
*
Diploma of structural design ( reinforced concrete buildings)
Egyptian syndicate of engineers (September.2016)
*
Project management professional preparation certificate
Egyptian syndicate of engineers (november.2016)
PROFILE
Result oriented Civil Engineer having bachelor degree in Civil
engineering. Having (8) eight years of Experience in the field of
construction of Fast Track Villas, housing buildings and drainage
stations and drainage pipes conduits in sultana Oman and Egypt. I
worked on precast slab (lattice girder) and deep foundation (piles)
EMPLOYMENT HISTORY
Sep.2014 to sep.2015 Orascom construction industries ( OCI )
Position : senior site engineer
Project : PK 27 B (egypt)
Owner : Emaar misr for development
*
This project includes the construction of (52) villa from
scratching to finish
*
Project is a part of a cluster of villas inside maraasi village at
north coast
*
The Villas are frame structure with extra quality finishing
specifications
*
The project cost is 104,000000 L.E
Responsibilities :
*
Running (26) villa at finishing phase to completion
*
Plan, organize, and direct activities concerned with the
construction of villas.
*
Determine, control and manage the labor and site material
requirements.
*
Direct and coordinate the subcontractors as per the contracts.
*
Requisition supplies and materials to complete construction
projects
*
Prepare and submit budget estimates, progress and cost tracking
reports.
*
Coordinating with the technical office for drawings and escalate
any variation/issue regarding the drawings to them.
*
Develop and implement the quality control procedures and safety
checks on site.
*
Leading the team of site supervisors and surveyors.
Feb.2014 to Sept. 2014 AL gohry for real estate investment co.
Position : site manager and general partner
Project : Porto mariem tower (egypt)
*
This project is a housing tower which consists of (13) hosuing
floor ,
(1 ) admnistration floor and basement
*
building is a frame structure with flat slab
*
building foudation contains (115) supporting pile with (12m)
length and (50cm) diameter
Responsibilities :
*
running total building from scratching to completion
*
revising architectural and strucural drawing and coordinatig with
consultant to escalate any variation or value engineering
regarding the drawings
*
prepare and determine contracts and rates for subcontractors
*
plan,organize and running concrete,finishing and MEP project
activites as per drawings
*
Requisition supplies and materials to complete construction
project
*
Prepare and submit budget estimates, progress and cost tracking
reports
feb. 2011 to feb2014 Al Rajhi for Development LLC.
Position: project engineer
Project: Bettina Coastal Housing Project (Oman)
Owner: Omani ministry of housing
*
This project includes the construction of 2200 villas, internal
roads and utility services for the new houses.
*
There is the cluster of houses distributed in various districts of
Oman along the coastal line.
*
The villas are of Frame Structure with Precast slab (Lattice
Girder).
*
The bathrooms and stairs are also precast.
*
This project cost is 300,000000 R.O
Responsibilities:
-----------------
*
Running the one site of total fifty villas from scratches to
completion.
*
Plan, organize, and direct activities concerned with the
construction of houses, roads and services.
*
Determine, control and manage the labor and site material
requirements.
*
Direct and coordinate the subcontractors as per the contracts.
*
Requisition supplies and materials to complete construction
projects
*
Prepare and submit budget estimates, progress and cost tracking
reports.
*
Coordinating with the technical office for drawings and escalate
any variation/issue regarding the drawings to them.
*
Develop and implement the quality control procedures and safety
checks on site.
*
Leading the team of site supervisors and surveyors.
May. 2010 to february. 2011 ELSHAHD CONSTRUCTION CO.
Position: Site Engineer
Project: construction of 4 villa compound at harm-bark (Oman)
*
This project includes the construction of 4 villa by total built
up area (298) meter square for each.
Responsibilities:
-----------------
*
Studying drawing and giving preliminary limited quantity and
determining rate per meter square for total villa contract
*
Direct and coordinate the subcontractors as per the contracts
*
Plan and arrange the material and equipment’s for the ongoing and
upcoming activities
*
Dividing work to phases and estimating required material,
manpower, time and cost for coming phase
*
Monitor the site activities and ensure that the work should be
executed as per the approved shop drawings and specifications.
*
To discuss the technical issues with the consultant.
*
To report the status of different activities on site and escalate
the site issues to the general manager
June. 2008-may. 2010 El nasr for construction and building (egyco)
Position: Site Engineer
Project: Maamora drainage stations and net pipe
This project has (1) main drainage station which serve (27) secondary
drainage station in (27) village
---------------------------------------------------------------------
Responsibilities:
-----------------
*
Organize and execute the construction works assigned to me related
to (1) secondary drainage station with its drainage net pipe from
scratching till completion and ensure that the work should be
executed as per the approved shop drawings and specifications.
*
checking plans, drawings and quantities for accuracy of
calculations
*
Raise the demand for different construction materials and
machinery required to accomplish the work.
*
Direct and coordinate the subcontractors as per the contracts
*
Coordinate with the survey and material section and arrange them
for various activities to get the smooth progress of works.
*
Organize and monitor the labor and machinery to get the maximum
efficiency.
*
Calculate the quantities for concrete and other materials
required.
*
Follow the progress and try to achieve the targets as per the
project plan.
*
Preparing daily logs and reports and maintaining records of
different activities.
COMPUTER SKILLS
*
MICROSOFT OFFICE
*
AUTOCAD (2D,3D)
*
SAP2000
*
Primavera P6
LINGUISTIC SKILLS
*
Arabic (mother language)
*
English (very good)
PERSONAL INFORMATION
Nationality: Egyptian
Date of Birth: 29 may 1986
Current visa status: visit visa
Holder of valid Omani and Egyptian driving License
4 of 4

  • ACTIVITATS K ºC ºF PUNT DE FUSIÓ DEL FERRO
  • TEXT CONSOLIDATED BY VALSTS VALODAS CENTRS (STATE LANGUAGE CENTRE)
  • DAS PERFORMANCE PLAN FINAL FY 2004 NAME OF AGENCY
  • CALCULATION OF LICENSED CAPACITY FOR NEW LICENSE APPLICATIONS AS
  • DRUK NR PROJEKT Z DNIA UCHWAŁA NR RADY MIASTA
  • IZVIJEŠĆE O RADU VATROGASNE ZAJEDNICE OPĆINE MARTIJANEC POŠTOVANI KOLEGE
  • SOCJOLOGIA III R STUDIA STACJONARNE I NIESTACJONARNE SOCJOLOGIA
  • SOLICITUD DE CONTADOR SOCIAL DE AGUA PARA SITUACIONES DE
  • MODELLING COMPLEXITY IN HEALTH AND SOCIAL SCIENCES BAYESIAN GRAPHICAL
  • GYÖNGYÖSMELLÉK KÖZSÉG ÖNKORMÁNYZAT 42007(IV02) RENDELETE AZ ÖNKORMÁNYZAT ÉS INTÉZMÉNYEI
  • JUEGOS Y MÁS JUEGOS 1 GOL DE PIERNAS 2
  • RESUMEN OBJETIVO ANALIZAR EL RESULTADO DE UN PROCESO DE
  • VARIOS EN WWWEURONEWSNET SE PUEDEN VER LAS NOTICIAS SUBTITULADAS
  • 3 CONTRATO DE COMPRAVENTA DE BIEN MUEBLE CON PAGO
  • CONVITE N° 2012006 O SESI – SERVIÇO SOCIAL DA
  • 1 Nazwa Firmy Instytucji Xceedance Consulting Polska sp z
  • AMATŐR SPORTOLÓI SZERZŐDÉS MELY LÉTREJÖTT EGYRÉSZT A(Z) ………………………………………………………………………………………… TOVÁBBIAKBAN
  • LITERATURE REVIEW RUBRIC DESCRIPTION OF ASSIGNMENT YOU ARE
  • 1(2) FÖREBYGGANDE AV TILLVÄXT AV LEGIONELLABAKTERIE INOM SÄRSKILDA BOENDEFORMER
  • ALASKA EFFORTS FOR SRLS THE ALASKA COURT SYSTEM’S FAMILY
  • NORMA OFICIAL MEXICANA (NOM) TÍTULO NOM050SCFI2004 INFORMACION COMERCIALETIQUETADO GENERAL
  • ANSWER KEY SOLID ROCKET BOOSTERS DIRECTIONS COMPLETE THE
  • I RELIGIOUS HOLIDAYS N ACCORDANCE WITH STATE LAW
  • SOUTH TEXAS ELECTRIC COOPERATIVE INCORPORATED SECTION RATES AND CHARGES
  • VĚSTNÍK 3 7 2008 INFORMACE PRO VEŘEJNOST O
  • HARPENDEN SKINFOLD CALIPER 0120 THE HARPENDEN SKINFOLD CALIPER HSKBI
  • KARTA ĆWICZENIA OZNACZANIE SUBSTANCJI ROZPUSZCZALNYCH W 1 NAOH GRUPA
  • CAS LA QUALITE A L’IUT L004 NOTE PEDAGOGIQUE
  • OFFICE OF THE NATIONAL COORDINATOR FOR HEALTH INFORMATION TECHNOLOGY
  • PERMISO PARA RECOGER TITULO WISCONSIN DEPARTMENT OF TRANSPORTATION MV2932S