bharat heavy electricals limited heavy power equipment plant hyderabad – 502032. india phones: 23182250/23020173 fax no.s : 04


BHARAT HEAVY ELECTRICALS LIMITED
Heavy Power Equipment Plant
Hyderabad – 502032. INDIA
Phones: 23182250/23020173
Fax No.s : 040-23021910 & 23021954,23186173
E-Mail : [email protected]
Date:
Due Date:
Supplier Qtn. No. :
Date :
___________________
___________________
___________________
___________________
TENDER DOCUMENTS TO BE FILLED BY THE SUPPLIER FOR SUPPLY OF
12 TON BOTTOM POURING LADLE
ADDRESS OF THE SUPPLIER:
TELEPHONE NO.S :
FAX NO.S :
E MAIL ADDRESS :
Sl. No.
DESCRIPTION OF BHEL REQURIMENT
BHEL SPEC.
OFFERED
DEVIATIONS
REMARKS
1.0
PURPOSE
Bottom pouring ladle of 12 Ton capacity is required to handle molten
Steel and to carry out pouring operations in Foundry.
2.0
TECHINICAL DETAILS
2.1
Capacity of Ladle
12 Ton
2.2
Quantity required
1 No.
2.3
Type of Ladle
Bottom pouring ladle with gear box assembly
2.4
DIMENSIONS
Supplier has to get the dimensions of the ladle wetted by M/s BHEL
after placement of Order and adopt the necessary changes if any.
The tentative dimensional details of the ladle can be as follows
2.4.1
Shell Dimensions
Inside Dia
1830 mm
Bottom Dia
1600 mm
Height
1830 mm
2.4.2
Plate Thickness
Side
16 mm
Bottom
20 mm
2.4.3
Refractory Lining
Side
165 mm
Bottom
215 mm
2.4.4
Top Clearance
390 mm
2.5
Details of Graphite Stopper Head
Supplier has to Specify
3.0
FEATURES :
3.1
Bottom pouring ladle shall be supplied with Stopper Rods and Nuts (2
No.s. ), operating lever arrangement, gear mechanism with hand wheel
for tilting the ladle, trunions, bail-arm, heat shield, hook / shackle
for lifting with EOT crane lop, legs, refractory lining ring, locking
lever etc.
3.2
Bottom pouring ladle shall be supplied with 5 No.s of graphite stopper
heads as optional item.
4.0
DOCUMENTATION:
4.1
Supplier shall furnish constructional details of the Ladle. i.e.
General arrangement drawing, volume to weight calculations for molten
steel along with the quotation.
4.2
Supplier shall furnish detailed dimensional sketches of stopper rod
with nut, refractory insulating sleeve to be fitted on to the stopper
rod, refractory nozzle and graphite stopper head.
4.3
Three sets of each of the following documents to be furnished along
with the Ladle
Operation Manual
3 sets
Maintenance Manual
3 sets
4.4
List of customers for similar geared bottom pouring ladle shall be
furnished along with the offer.
5.0
PRE INSPECTION :
M/s BHEL Engineers will inspect the Ladle at suppliers works before
dispatch.
6.0
GUARANTEE :
The geared bottom pouring Ladle shall be guaranteed for a period of
one year from date of commissioning.
7.0
SPECIAL REMARKS:
7.1
Vendor shall submit technical offer and price offer separately in two
sealed covers
7.2
They shall be original equipment manufacturers
7.3
They shall be in line of manufacturing of similar Bottom pouring
ladles with capacities greater than or equal to 5 Ton and up to 20 Ton
for not less than 5 years.

  • EVIDENCEBASED POLICYMAKING WHAT IS IT? HOW DO WE
  • KRYTERIA OCENIANIA OSIĄGNIĘĆ UCZNIÓW Z HISTORII W KL IV
  • DISK SUBSYSTEM PERFORMANCE ANALYSIS FOR WINDOWS — 31 DISK
  • GHIDUL DE UTILIZARE A SERVICIULUI “DECLARAŢIE ELECTRONICĂ” CHIŞINĂU
  • N ATIONAL MARINE AQUARIUM HUSBANDRY VOLUNTEERING EXPRESSION OF
  • EDUCACIÓN DIFERENCIA UNA EXPLICACIÓN LA EDUCACIÓN DIFERENCIADA LA JORNADA
  • Discussion Guide for the Time Bind by Arlie Hochschild
  • 5 002816 28 DE FEBRERO DE 1991
  • ESQUEMA DE LA METODOLOGÍA DE TRABAJO DEL INGENIERO EN
  • ATIVIDADE DE PROGRAMÇÃO IMPLEMENTAÇÃO DE UMA BIBLIOTECA
  • ACİL BATIN RADYOLOJİSİ YARD DOÇ BENGI GÜRSES YEDITEPE ÜNIV
  • SPRAYBERRY HIGH SCHOOL P T S A
  • HAVA HATTI İLETKENLERİNİN EN BÜYÜK SALINIM DURUMUNDA YAPILARA VE
  • MULTIPLYING AND DIVIDING DECIMALS MULTIPLYING DECIMALS MULTIPLYING DECIMALS IS
  • ESPECIALIDAD EXCURSIONISMO REQUISITOS Y RESPUESTAS 1 DISCUTE CON
  • COLOR COLOR IS THE REFLECTION OF LIGHT FROM A
  • ORAŠJE0622015 GOD SLUŽBENI GLASNIK OPĆINE ORAŠJE BROJ 1 STRANICA
  • Edicto Juzgado de Investigacion Preparatoria Chupaca Causa Penal
  • OBČINA VRANSKO VRANSKO 59 3305 VRANSKO TEL 03 703
  • DKS111442019 KIELCE DNIA 12 MARCA 2019 R LISTA KANDYDATÓW
  • PRAKTISCHE OPDRACHTEN ELEKTRISCH VELD  EQUIPOTENTIAALLIJNEN TEKENEN M ET
  • MÁSTER EN INVESTIGACIÓN BIOMÉDICA UNIVERSIDAD DE VALLADOLID CURSO APLICACIONES
  • ALQORITM TESTLƏRI 1 ALQORITM A) MÜƏYYƏN GÖSTƏRIŞIN YERINƏ YETILMƏ
  • WARWICK DISTRICT COUNCIL LOCAL PLAN MAIN MODIFICATIONS SUSTAINABILITY APPRAISAL
  • MINES REQUIRE MINE OWNERS TO SUPPLY MAPS TO ADJOINING
  • U SKLADU SA ODREDBAMA ZAKONA O HIPOTECI („SLUŽBENI GLASNIK
  • SCHOOLJAAR 20142015 “HOE WAS HET OOK ALWEER?” WIST U
  • ANTE LA SITUACIÓN DE RIESGO SANITARIO DEBIDO A LA
  • PROCEDIMIENTO DE SOLICITUD DEL “SELLO DE CONFIANZA” INSTRUCCIONES
  • DESCRIPCIÓN ESPACIO COMPARTIDO COMO SABÉIS DISPONEMOS DE UN ESPACIO