Progress report for Odense Pilot River Basin
Author: Harley Bundgaard Madsen, Odense Pilot River Basin leader
Reporting Period: 1st of April – 30th of June 2003
Date of submission: 30th of June 2003
Fyn County Council has chosen to carry out the Odense Pilot River
Basin Project in the form of real-life testing to the greatest
possible extent in order to ease the coming Article 5 reporting to the
EC in 2004 and the River Basin Management Plan in 2008. Via the Odense
Pilot River Basin Project, a Pilot River Basin Management Plan for
Odense Fjord and its catchment will be prepared.
The pilot project's first phase comprises the preparation of a
preliminary report commenting the Guidance Documents 2.1, 2.2, 2.3,
2.4, 2.6, and 2.8, to meet the requirements in the ToR. The report
will be presented to the EC by 1 October 2003. By 1 November 2003 a
preliminary report that meets the requirements in the WFD's Article 5
will be prepared and presented to the EC. A report on testing of the
remainder of the guidelines (2.5, 2.7, 2.9, 3.1) will be prepared and
presented to the EC before 1 July 2004.
The budget for the project, related projects etc. is presented in the
Draft Summary of PRB meeting in Brussels of 28 February 2003 (version
of 25 March 2003).
The status of results for the project achieved from 1 April 2003 to 30
June 2003 is described below.
1. Key activities, meetings, progress
*
Establishment of a homepage for the project in Danish by May 2003
(http://prb.fyns-amt.dk). An English version is planned for August
2003. Poster, presentations, progress reports etc. may be
downloaded from this homepage.
*
3-4 April: Participation and presentation at the PRB-WS in Italy.
*
25 April : 1st Meeting of the political-regional advisory board
for the project, in which municipal politicians, authorities and
interested groups, such as the agricultural organisations, The
Danish Society for Conservation of Nature, and many others with an
interest in the project were represented. Programme,
presentations, list of participants and minutes from the meeting
can be found (in Danish) at the prb-homepage.
*
25 April : Meeting with companies representing relevant knowledge
of agriculture and cleaning techniques for agricultural waste.
*
6 May : 1st meeting of the national/technical advisory board for
the project, in which the national authorities, research
institutions, and consultancy firms with interests in
implementation of the Water Framework Directive in Denmark were
represented. Programme, presentations, list of participants and
minutes from the meeting can be found (in Danish) at the Odense
prb-homepage.
*
18-19 June: Participation and presentations, oral as well as
poster, at the Hellenic Water Week “International seminar on the
implementation of the Water Framework Directive in the European
Union and beyond”.
*
26 June: 3rd internal steering group meeting.
*
30 June: Production of public material for the Regional Planning
hearing round for Fyn County, the municipal authorities and the
public in August-October (see previous progress
*
report for description of the Danish Regional Planning system).
2. Deliverables
Reporting Art. 5:
The structure of the planned Article 5 working report will follow the
framework that is nationally intended in Denmark to be used for the
coming Article 5 reports. Draft chapters have been prepared for those
parts of the report that give a general characterisation of the Odense
PRB catchment, namely topography, land use, impacts, and
characterisation (including type classification and assessment of HMWB
status) for watercourses, lakes, wetlands, and coastal waters, and for
groundwater conditions in the catchment. (see Progress report of 1
April 2003 for table of contents).
An Art.5-working report will be available in Danish by 1 October and
in English by 1 November 2003.
ToR-comments on Guidance Documents:
Comments on parts of Guidance Documents according to Art. 5:
*
GD 2.1 Impress; 2.2 Heavily modified Water Bodies by 1 April (see
Progress report of 1 April).
*
GD Identification of Water Bodies by 30th of June (will be sent
separately).
A collated report on ToR-Guidance commenting will be submitted to EU
by 1 October 2003.
Presentations
*
Presentation at the PRB-coordinator meeting at Bruxelles 3-4 April
2003 (see EU-PRB-homepage).
*
Presentation at the Hellenic Water Week 18-19 June “International
seminar on the implementation of the Water Framework Directive in
the European Union and beyond” (see EU-PRB-homepage).
*
Odense PRB-poster presented at the Hellenic Water Week 18-19 June
2003 (Annex 1).
Data delivery
*
June 2003: delivery of relevant emission data for Odense PRB to
the ETC/WTR for testing the EUROWATERNET-emissions guidelines
together with the IMPRESS guidance document.
3. Progress evaluation
Estimation of the work percentage accomplished to meet the November 30
deadline: 30%.
4. Deviations from the original work plan
Separation of submission to EU of the ToR-report on GD’s by 1 October
and the Art-5-report by 1 November means a one month delay of the
Art-5-report compared to the previous time schedule. There are no
other changes to the general timetable previously submitted.
5. Planned activity until the next progress report (30-09-2003)
*
30 June: Submission to EC of comments on GD Identification of
Water Bodies.
*
8 July: PRB-coordinator meeting in Bruxelles. Preparation of
presentation.
*
August-September: Ad-hoc meetings with national experts acc. to
the national Advisary Board cooperation.
*
August-September: Identification of cooperation projects with
relevant consultant companies, representing knowledge of
agriculture and cleaning techniques for agricultural waste.
*
August-October: Regional Planning public hearing round with the
municipalities: presentation and discussion of the PRB-project.
*
August-October: establishing an English version of the Odense
PRB-homepage.
*
August-30 September: preparation of a ToR-report on relevant parts
of Guidance. Documents related to Art. 5: GD 2.1 Pressure and
impact; 2.2 Heavily modified water bodies; 2.3 Reference
conditions, inland waters; 2.4 Typology and classification,
coastal waters; 2.6 Economic Analyses; 2.8 Ground Water; GD 2.9
Best practice in river basin planning - Public Participation.
*
August-October: preparation of the Art. 5-report.
*
17 September: 4th Steering Group meeting of the Odense
PRB-project.
6. Risk Factor Analysis
*
As cross-sectional accession to human resources is prerequisite
for the Odense PRB Project, it has demanded considerable resources
to build up the appropriate project organisation and to coordinate
work across the specific technical sectors.
*
For a number of areas the necessary data foundation for completing
type classification and division of water bodies after the GD's
guidance notes is insufficient or it has required considerable
resources to obtain the necessary data. This is the case for the
smallest streams (those managed by municipal authorities or
private landowners), and for most small lakes and ponds, and for
wetlands in general in the Odense River Basin.
*
Inclusion of the general public and interested collaborative
parties requires considerable resources, despite the fact that the
County's personnel can draw on experience from the
well-established regional planning process.

  • UCAB FACULTAD DE INGENIERÍA LISSET DE GOUVEIA DE DA
  • DECRETO NO 2340 DEL 19 DE SEPTIEMBRE DE 1997
  • CONSILIUL MUNICIPAL ORHEI PROIECT D E C I Z
  • DRAFTING NOTES ON INE CRUDE OIL OPTIONS CONTRACT SPECIFICATIONS
  • LOCAL FINANCE NOTICE 201011 APRIL 12 2010 PAGE 2
  • UNIVERZITA J SELYEHO PEDAGOGICKÁ FAKULTA SMERNICA DEKANA PF UJS
  • LOCALIZACIÓN EXACTA DE UN PUNTO DE LA TIERRA PARA
  • BUSINESS ASSOCIATE ADDENDUM THIS BUSINESS ASSOCIATE ADDENDUM (“ADDENDUM”) IS
  • HACCPBASED SOPS TRANSPORTING FOOD TO REMOTE SITES (SATELLITE KITCHENS)
  • CURRICULUM VITAE APOLONIJA ŠUŠTERŠIČ BORN IN LJUBLJANA SLOVENIA LIVING
  • BILAG B – ANSØGNINGSSKEMA (BILAGET LIGGER OGSÅ PÅ
  • GRAU EN TRADUCCIÓ I INTERPRETACIÓ 202021 1R CURS 1R
  • 2 GOBIERNO DE PUERTO RICO 18VA ASAMBLEA 6TA SESIÓN
  • DEPARTAMENTO DE MATEMÁTICAS EJERCICIOS DE 1º ESO – REPASO
  • HVA ER GJENNOMFØRT I FORHOLD TIL NÅVÆRENDE PLAN OG
  • ZAŁĄCZNIK NR 5 PROCEDURA ODBIORU PRAC DZIAŁ I –
  • LOCAL FINANCE NOTICE 20109 MARCH 26 2010 PAGE 0
  • CUESTIONARIO I TEORÍA DE JUEGOS CURSO 201112
  • COMMISH CORNER – SPRING SEASON WEEK 1 TOP NEWS
  • GRUNDSCHULSPRENGEL KLAUSEN I DATUM ORT THEMA REFERENTIN ZIELGRUPPE
  • GUIDANCE NOTE ARGYLL AND BUTE LOCAL REVIEW BODY
  • FATCA POSTOPKI DOLŽNE SKRBNOSTI GLEDE IDENTIFICIRANJA IN POROČANJA RAČUNOV
  • JOB DESCRIPTION JOB TITLE FUNDRAISING & MARKETING ASSISTANT
  • APPENDIX A1 CERTIFICATION OF HAZARD ASSESSMENT (SINGLE TASK) ASSESSMENT
  • CURRICULUM VITAE NAME KHALID N M ALKHERO BIRTH DATE
  • DECLARATION OF SECURITY NAME OF SHIP PORT OF
  • 8 S YGN AKT I ACA 26411 WYROK
  • CURRICULUM VITAE (2013) NAME PROF DR ZACHARIA ABDULSALAM
  • BILLING CODE 481025 DEPARTMENT OF THE TREASURY DEPARTMENTAL
  • NICOLE MARTIN NOVEMBER 4 2007 DIGITAL PRESERVATION MIAP