division of research integrity & compliance decontamination checklist prior to renovations in active bsl-2 labs laborator



DIVISION OF RESEARCH INTEGRITY & COMPLIANCE

Decontamination Checklist Prior To Renovations in Active BSL-2 Labs
Laboratory Investigator Name:
 
Contact Number:
 
Building name & room number:
 
Anticipated date of renovation
 
Brief description of renovation(s)
 
Please contact the Institutional BioSafety Officer at (813) 974-0954
if further information on this issue is needed. NOTE: The following
Checklist MUST be completed and signed by Principal Investigator/Lab
Director prior to renovations in BSL-2 lab.
1.
All work areas such as bench tops and biosafety cabinet surfaces
have been decontaminated.
Yes No
2.
All areas where maintenance work is to be conducted (e.g.
refrigerators, under benches and sinks, lights etc,) have been
decontaminated. Where maintenance work is to be performed, such as
under sinks, all hazardous materials must be removed and stored in
a safe place until work is completed.
Yes No
3.
Please describe method of equipment decontamination (i.e.
disinfectant used for particular equipment such as refrigerators,
centrifuges etc. and contact time).
 
4.
All biohazardous waste (solid, sharps, liquid) has been placed in
appropriate biohazardous waste/sharps containers.
Yes No
5.
All infectious materials have been secured in leak-proof
containers. No infectious materials are on counters or in cabinets
where renovation work is being performed.
Yes No
6.
Appropriate PPE are available for maintenance staff.
Yes No
7.
All maintenance staff will be escorted and will not be left
unattended in BSL-2 lab area.
Yes No
Name of Principal Investigator/Lab Director:   Signature:
__________________ Date:  

The Biosafety Office has been notified.
Institutional Biosafety Officer
Name:   Signature: ___________________________ Date:  
RCDC # 017.3
Revision date 02/2017

  • FORM B INCOME AND EXPENSE QUESTIONNAIRE – CITY OF
  • HOW CAN MIND MAPPING HELP A STUDENT? LEGEND
  • 2 PRESS RELEASE 25 FEBRUARY 2011 NEW CONTRACT WITH
  • DECRETO 182018 DE 7 DE JUNIO POR EL QUE
  • PRILOGA 2 – SKLEP UO IZ DNE 21122015 O
  • ZAŁĄCZNIK NR 4 DO ZAPYTANIA OFERTOWEGO ARKUSZ KALKULACYJNY ILOŚCI
  • MODELO 2A NOTAS PREVIAS A TENER EN CUENTA EN
  • DECRETO Nº 57711 DE 28 DE DEZEMBRO DE 2011
  • UCHWAŁA NR RADY MIASTA PŁOCKA Z DNIA
  • RESPONSIBILITIES OF THE TEACHER CANDIDATE SUCCESS IN STUDENT TEACHING
  • RESOLUCION NO 0330 DE 2007 ( 30 DE MAYO
  • EN EL BOPA Nº249 DE 30 DE DICIEMBRE DE
  • GRUPO 2 ENTREGA DE LOS PREMIOS AL MEJOR PROYECTO
  • ERKLÆRING OM AUTORISATION TIL ØKOLOGI SKAL KUN
  • NA OSNOVU ČLANKA 4 STAVAK 3 ZAKONA O KOMUNALNOM
  • MATCH ITEMS IN COLUMN A WITH ITEMS IN COLUMN
  • ANNEX C MEMÒRIA EXPLICATIVA DE L’ACTIVITAT D’INVERSIÓ D’OBRES
  • LO QUE NOS CUENTAN LOS LIBROS DE TEXTO Y
  • VODNÍ ZDROJE EKOMONITOR SPOL S R O PÍŠŤOVY 820
  • LEY 22016 DE 28 DE ENERO DE MEDIDAS FISCALES
  • CÉDULA DE CIUDADANÍA PARA LA MUJER HACE 48
  • COMUNICACIÓN DE TRABAJO AUTÓNOMO DDÑA………… CON DNI………… Y NAF
  • TASAS DE INTERÉS PARA DEPÓSITOS A PLAZO FIJO EN
  • APPLICATION NO (FOR OFFICE USE ONLY) INSTITUTE OF
  • TEACHER THE APPS FOR GOOD PROJECT IS A NATIONAL
  • FRAME 2 28 NOVEMBER 2012 SILABUS KELAS III TEMA
  • ỦY BAN BẦU CỬ TỈNH HẢI DƯƠNG SỐ 01KHUBBC
  • UAAG 10 POSTSCRIPT FORMAT UAAG 10 PDF FORMAT UAAG
  • WZÓR 2 JELENIA GÓRA DNIA NAZWA INKASENTA URZĄD
  • EL DUEÑO DE LA LUNA ENLACE AL VÍDEO HTTPSWWWYOUTUBECOMWATCH?V6JDYJX9BKKC