euromet project final report 1. ref. no.: 377 2. subject field: thermometry 3 type of collaboration: comparison 4a. partners
EUROMET PROJECT
FINAL REPORT
1. Ref. No.: 377
2. Subject Field: Thermometry
3 Type of collaboration: Comparison
4A. Partners:
AIST-NMIJ, BNM-INM/CNAM, Cryogenic Laboratory, IMGC, INTiBS, MSL,
NIM, NIST, NMi-VSL, NPL , NRC, PTB, VNIIFTRI
4B. CEC funded?
No
5. Participating countries:
Japan CA China DE FR GB IT New Zealand NL PL RU US
6. Title:
Star Intercomparison of Low-Temperature Fixed Points Using Sealed
Triple-Point Cells
7. Progress:
All comparison measurements were completed, the results obtained for
the four investigated triple points have been evaluated, and the cells
are being sent back to the partners.
The main results are already published in two joint papers:
1.
B. Fellmuth, D. Berger, L. Wolber, M. de Groot, D. Head, Y.
Hermier, Y. Z. Mao, T. Nakano, F. Pavese, V. Shkraba, A. G.
Steele, P. P. M. Steur, A. Szmyrka-Grzebyk, W. L. Tew, L. Wang, D.
R. White: An International Star Intercomparison of Low-Temperature
Fixed Points Using Sealed Triple-Point Cells. In: Temperature: Its
Measurement and Control in Science and Industry, Vol. 7, D. C.
Ripple et al. (ed.), Melville, NY, American Institute of Physics,
2003, pp. 885-890.
2.
B Fellmuth, L Wolber, Y Hermier, F Pavese, P P M Steur, I Peroni,
A Szmyrka-Grzebyk, L Lipinski, W L Tew, T Nakano, H Sakurai, O
Tamura, D Head, K D Hill, A G Steele: Isotopic and other
influences on the realisation of the triple point of hydrogen. In:
Metrologia, 2005, 42, pp. 171‑193.
It is planned to prepare a second comprehensive paper for publication
in Metrologia (in 2006) and three detailed reports describing the
measurement method, the huge amount of data, and the obtained
information on the properties of the four fixed-point materials,
respectively, as follow-up activities. Thus, the project is completed.
8. Coordinator´s name: Dr. Bernd Fellmuth
Address: Physikalisch-Technische Bundesanstalt
Abbestrasse 2-12
D-10587 Berlin
Telephone: Telefax: E-mail:
+49 30 3481 7224 +49 30 3481 7490 [email protected]
9. Completion date:
2005-12-31
10. Coordinator´s signature:
11. Date:
2006-03-23
Notes for completion of the form overleaf
NOTES FOR THE COMPLETION OF THE FORM
(numbers refer to boxes overleaf)
IMPORTANT - The form must be typed or completed in black ink to
facilitate photocopying.
1) Ref. No. The reference number of the Agreed Project Form on which
progress is being reported should be entered.
2) Subject Field The field specified on the Agreed Project Form on
which progress is being reported should be entered.
3) Type of collaboration See "PROPOSED EUROMET PROJECT" item 3.
4A) Partners Any institutes, which have already indicated a desire to
participate in the proposed collaboration, should be indicated in
alphabetical order using their standard acronyms.
4B) CEC Funding Place "X" only if funding is ensured.
5) Participating countries The participating countries should be
indicated in alphabetical order by the letters signifying their State.
See country codes in the last section of the directory.
6) Title The title of the proposed collaboration should be specified
in not more than 60 characters (including spaces).
7) Progress A brief description of the progress should be entered in
the space provided. Comments on the advantages of undertaking the work
collaboratively through EUROMET would be useful. Completion of this
Report is not deemed as publication of the work. Collaborators are
encouraged to publish their work through normal channels, mentioning
it was undertaken as a EUROMET collaboration.
8) Coordinator The Coordinator is the person who is appointed as the
contact point for the project detailed overleaf. The name, full postal
address, telephone and fax numbers, e-mail address (where available)
of the coordinator should be given.
9) Completion date If the progress of a project is being reported on
this form then an estimate of the completion date should be made. If
the project has now been completed then the actual date of completion
should be given. For permanent agreements (e.g. development of primary
standards) "ON-GOING" should be entered.
10) Coordinator's signature Only the original signed copy of a final
report should be forwarded to the EUROMET Secretary.
11) Date This form should be dated the day of signature.