d esign, construction and inspection of compressed ========================================================= natural gas and hydrogen refu

D ESIGN, CONSTRUCTION AND INSPECTION OF COMPRESSED
=========================================================
NATURAL GAS AND HYDROGEN REFUELLING STATION REPORT
==================================================
A B-273 Page 2 of 2 2017-07
NOTE: This report shall be completed by the person responsible for the
installation of the refuelling station (page 1
and 2), in DUPLICATE and submitted to the ABSA Safety Codes Officer
for the purpose of verifying and documenting compliance with the
Pressure Equipment Safety Regulation. One copy signed by the Safety
Codes Officer shall be returned to submitter upon completion and
acceptance of the installation.
1.
Ultimate Owner
 
(Name and Address)
2.
Location of Plant
 
(Sec, TWP, Rge)
3.
Plant previously registered under PP -
 
4.
Type of Refuelling Station (choose one)
Compressed Natural Gas Hydrogen or Both
5.
Prime Contractor
 
Ref. or Job No.
 
 
(Company Name and Address)
Select one of the following:
If Piping has been registered skip Section(s) 6 to 9,
(mandatory design registration for piping systems > 500 liters),
If Piping aggregate internal volume is NOT exceeding 500 liters and
has NOT been previously registered with ABSA, complete Section(s) 6 to
9 by Professional Engineer.
6a.
Engineered by
 
Ref. or Job No.
 
 
(Company Name and Address)
6b.
Permit to Practice Number
 
7. Pressure Piping to comply with the Code: B31.1 B31.3  
(Edition/Addenda)
8.
List of documents with revision numbers (If additional space is
required, use supplemental sheets) P&IDs, PSV and Line Lists,
Specifications for pipe, valves and all fittings included in the scope
of this piping design registration. If documents are listed on
supplemental sheet, record the supplemental sheet numbers in this
space.
 
P. Eng Stamp
 
 
9.
Name and authenticated stamp/seal of Professional Engineer
By applying my stamp/seal and signature to this document, I, (print
name)   , accept responsibility for the piping design in accordance
with (Code/Edition/Addenda)  , CSA B51 Part 3, the Safety Codes Act
and Regulations.
10a. Are all fittings suitable for the specific design service
conditions? Yes
10b. Are all fittings (except for hose assemblies) registered with
ABSA? Yes Pending
10c. Are all hose assemblies manufactured to RMA IP-2 or registered
with ABSA? Yes
11. Have all piping butt welds been examined radiographically? Yes
(CSA B51, Part 3 - 5.4)
12. Has a Certificate of Inspection Permit been issued for all
pressure vessels? Yes (PESR, 33)
13. Have all the required inspections been conducted and documented?
Yes (CSA B51, Part 3 - 4.4)
14. Has overpressure Protection been provided? Yes (CSA B51, Part 3 -
5.6)
*
A safety valve shall be installed on the compressor outlet and set
to open at or below the design pressure of the downstream system.
(CSA B51, Part 3 - 5.6.1)
*
Where ground storage vessels can be isolated from the safety valve
previously mentioned, a separate safety valve is required by the
vessel code of construction. (CSA B51, Part 3 - 5.6.2)
15. Pressure testing has been witnessed by ABSA Safety Codes Officer?
Yes
Pressure Test shall be (CSA B51, Part 3 - 5.5):
*
not less than 1.5 times system design pressure for hydrostatic
testing
*
not less than 1.2 times system design pressure for pneumatic
testing (see AB-522, AB-532 for req’s)
*
held for 30 minutes or longer if necessary to inspect for leakage
*
held for 24 hours and a recording chart shall be used if part of
the system has been buried or is otherwise inaccessible for
inspection
16. Piping Construction forms (AB-83 and AB-83F) shall be reviewed
with ABSA SCO and duly certified? Yes
17. Permit has been obtained from the local gas authority? Yes Permit
# 
Note: For information on obtaining a gas permit go to
http://www.municipalaffairs.alberta.ca/permits
18. General Remarks  
 
 
19. Certificate of Compliance
We certify that the statements made in this Report are correct and
that all design, material, construction and workmanship on this
refuelling station conform to the requirements of the Alberta Safety
Codes Act and CSA B51 Part 3.
 
 
(Company Name)
(AQP Number & Expiry Date)
 
(Print Name)
(Signature & Date)
20. Certificate of Inspection
I have inspected the refuelling station described in this report. To
the best of my knowledge, this work has been completed in accordance
with the requirements of the Alberta Safety Codes Act and CSA B51 Part
3.
ABSA SCO (print name)
Signature & DP Number
Date

  • TEXTO 6 ALGUNAS PALABRAS SOBRE MI CIUDAD FAVORITA PÁGINA
  • BUFFERS THE EASTERN BOUNDARY OF THE PROPERTY SHALL BE
  • C UDFYLDES AF CBF MODTAGET (STEMPEL) ENTER FOR BØRN
  • POŚWIADCZENIE WYKONANIA USŁUGI OKREŚLENIA NOŚNOŚCI DROGI I STOPNIA ZAGĘSZCZENIA
  • SARI KURNIASIH INAYAH 2011 PEMENDEKAN BAHASA SMS MAHASISWA FAKULTAS
  • ARGENTINA INFORME ECONÓMICO (1ER SEMESTRE 2019) 1 ÍNDICE LEHENDAKARITZA
  • KROATIENTAG 2011 FREUDE ÜBER BALDIGEN EUBEITRITT KROATIENS DER EUBEITRITT
  • AGENCIJA ALAN DOO ZA UVOZ I IZVOZ NAORUŽANJA I
  • FAIRFIELD COUNTY DEBRIS MANAGEMENT PLAN FAIRFIELD COUNTY DEBRIS
  • IES EL ESCORIAL PROYECTO GLOBO GLOBE PROJECT USO
  • BIBLIOGRAFIE PENTRU OCUPAREA PRIN CONCURSEXAMEN A POSTULUI VACANT DE
  • 7 SALINAN MENTERI DALAM NEGERI REPUBLIK INDONESIA PERATURAN MENTERI
  • TRATADO DE EXTRADICIÓN ENTRE CHILE Y BOLIVIA FIRMADO EN
  • STUDY GUIDE FOR MACBETH ACTS IV AND V 1
  • UNIVERSIDAD NACIONAL DE CATAMARCA FACULTAD DE DERECHO SAN FERNANDO
  • LES OBJETS CONFECTIONNÉS I – INTRODUCTION LES OBJETS CONFECTIONNÉS
  • ACCESS THE FINEST SCHOLARLY CONTENT THROUGH CAMBRIDGE BOOKS ONLINE
  • BOATING SAFETY TIPS 1 LOCAL KNOWLEDGE REQUIRED OF THE
  • MEDIA FILTER MAINTENANCE PLAN DATE OF INSPECTION PROPERTY ADDRESS
  • P AUTAS PARA EL DISEÑO DE ENTORNOS EDUCATIVOS ACCESIBLES
  • BELGISCHEN BOTSCHAFT IN WASHINGTON – DC NAME VISUMBEWERBER AKTENZEICHEN
  • FACULTAD DE ESTOMATOLOGÍA ASIGNATURA MICROBIOLOGIA GENERAL Y APLICADA SILABO
  • STANDARDAVTALE AVTALE NR ……… KUNDENR …… AVTALE OM
  • !DOCTYPE HTML HTML HEAD TITLE[VUFIND493] XSLT TRANSFORMATION SPLIT KEYWORDS
  • PENNINGTON FAMILY FOUNDATION MIDTERM REPORT INSTRUCTIONS WHEN ONE COPY
  • EUROPA DESPRES DEL FINAL DE LA GRAN GUERRA LA
  • 10 TOOLKIT FOR URBAN WATER SUPPLY PROJECTS MODULE 4
  • REPUBLICA MOLDOVA CONSILIUL RAIONAL HÂNCEŞTI DIRECŢIA ÎNVĂŢĂMÎNT HÂNCEŞTI 3401
  • DISEÑO DE PRODUCTO ORIENTADO AL USUARIO MEDIANTE
  • DEEP USE ONLY DATE OF RECEIPT FILE