curriculum vitae rahman hadi place & date of birth : tasikmalaya, west java. indonesia. 6th december 1985. gender : male
CURRICULUM VITAE
RAHMAN HADI
Place & Date of birth : Tasikmalaya, West Java. Indonesia.
6th December 1985.
Gender : Male
Marital Status : Married
Address : Puri Agung 2A, Block D No. 15, Batam, Indonesia
Mobile Phone : +628116914217
E-mail : [email protected]
LANGUAGES
English & Indonesian
TECHNICAL QUALIFICATIONS & INHOUSE TRAINING
*
QMS Lead Auditor ISO 9001 (Provider: DNV Singapore)
*
Leadership & Supervisory Training (Provider: NOV XL Systems)
*
CSWIP 3.1 Welding Inspector (Provider: TWI)
*
MT/PT, ASNT Level II (Provider: dB School of NDT)
*
UT, ASNT Level II (Provider: dB School of NDT)
*
RT Interpreter, ASNT Level II (Provider: Offshore Training
Institute)
*
Lean Manufacturing Training (Provider: NOV XL Systems)
*
API Spec. Q1 (Provider: DNV Singapore)
*
Piping Inspector (Provider: Offshore Training Institute)
*
Welding Inspector (Provider: Universal Institute, BNSP)
*
Incident Investigation and Root Cause Analysis (Provider: PSG
Singapore)
*
Auditor SMK3/Indonesia Work Safety Standard (Provider: Neville
Clerk)
*
Safety Visit Skill (Provider: PT. Citra Tubindo Tbk. & PT. Bredero
Shaw)
*
FMEA, MSA & SPC (Provider: Neville Clerk)
*
Awareness and Internal Auditor ISO 9001 (Provider: PT. Epson
Batam)
*
Awareness and Internal Auditor ISO 14001, Risk Assessment,
Environmental Aspect Impact. (Provider: Surveyor Indonesia)
FORMAL EDUCATION
*
Diploma III, Polytechnic State of Bandung, Indonesia (2003 - 2006)
WORK HISTORY & PROFESSIONAL EXPERIENCE
NATIONAL OILWELL VARCO
Scope: Fabrication of Oil and Gas Equipment
Location: Batam - Indonesia
Position: QA/QC Supervisor
Working Period: 2011 – Present.
Job Description:
A. Fabrication/Welding/NDT Inspections
- Coordinate CSWIP Welding Inspector to perform and ensure Inspection
on Raw Materials & MTRs Review are acceptable as per Purchase Order.
- Coordinate CSWIP Welding Inspector to perform and ensure Inspection
on Welding Fit-up, Pre-Heat Temperature in accordance with
WPS/Customer Spec.
- Coordinate CSWIP Welding Inspector to perform and ensure Welding
Parameters (Volt, Ampere, Travel Speed, Heat Input, Inter Pass
Temperature and Essential Variable), and Welding Process
(FCAW/GMAW/SMAW/SAW/Friction Weld) are within WPS/ASME Sec. IX
allowable ranges.
- Coordinate CSWIP Welding Inspector to perform and ensure Visual
Inspection on Welding Capping/Root profile/Flush Removal in accordance
with WPS/Customer Spec.
- Coordinate vendor NDT Level III to create NDT Procedures accordance
with customer specification.
- Coordinate vendor NDT ASNT/PCN Level II to perform UT/RT/MPI/SEA and
ensure it comply with Applicable Spec. / Customer Spec.
- Coordinate the vendor to perform PWHT Process (Stress Relive /
Austenitizing / Quenching / Tempering )
- Coordinate CSWIP Welding Inspector to perform and ensure Visual
Inspection on High Fatigue profile in accordance with Specification.
- Coordinate Destructive Test Lab to perform Weld Qualification
Test/Destructive Test in Subcontractor Laboratory and verify the
result.
- Coordinate and Ensure Drift Test and Welded Connector to Connector
Alignment in accordance with Specification.
- Coordinate and Ensure Final Inspection on Welded product in
accordance with Specification.
- Witness/Monitoring pipe External/Surface Coating.
- Review Fabrication Drawing.
- Maintaining Welder Qualification as per ASME Sec. IX.
- Endorse Quality Documentation Package (QDP)/COC & Tally Sheet.
B. Threading/Machining Inspections
- Coordinate and Ensure Inspection on Raw Materials & MTRs are
acceptable as per Purchase Order.
- Coordinate and Ensure Inspection on Machining Process in accordance
with Specification.
- Coordinate and Ensure Inspection on Machining Probe
Evaluation/Gaging in accordance with Specification.
- Coordinate and Ensure Visual Inspection on Machining Product in
accordance with Specification.
- Coordinate and Ensure Inspection on Phosphating Thread connection in
accordance with Specification.
- Coordinate and Ensure Drift Test in accordance with Specification.
- Coordinate and Ensure Final Inspection on Threaded product in
accordance with Specification.
- Witness/Monitoring pipe Coating.
- Review Fabrication Drawing.
- Endorse Quality Documentation Package (QDP)/COC & Tally Sheet.
C. Quality Management Systems
- Review Technical Requirement of Customer Purchase Order.
- Generate ITP accordance with Customer Specification, Industrial
Code/Standard.
- Coordinate Inspection activity for Customer Representative/TPI
Inspector.
- Lead Auditor for Internal Quality Audit
- Lead Auditor for Supplier/Subcontractor Audit
- Facilitate Customer/ISO/API Audit.
- Establish & Maintain Quality Management System, liaise with other
department if any requirement changes and conduct training for the new
requirement.
- Monitoring Production Performance and Conduct Quality Meeting to
take Corrective/Preventive Action if any discrepancy/nonconformity.
- Perform Root Cause Analysis for Customer Complain and Quality Issue.
- NCR Disposition.
- Maintain Calibration Master List and Gages Availability.
- Facilitate Each Department to Conduct Management of Change.
- Monitoring Delivery Performance.
- Management Review Meeting.
D. Supplier/Subcontractor Monitoring
- Coordinate and Perform Supplier Qualification Audit and Annual audit
to Approved Vendor List.
- Follow up status of Supplier Corrective Action & Preventive Action
Request and ensure the effectiveness.
- Contribute in reduce cost activity related with Supplier job scope.
- Monitoring Supplier activities/Vendor Performance.
- Meeting with suppliers to ensure they are aware and understand with
client requirement.
E. Health, Safety & Environmental
- Give Safety Toolbox Meeting to QC personnel prior start work
- Maintain Safety Risk Assessment in QC Department
- Maintain Environmental Aspect Impact in QC Department
- Conduct Yearly Safety Internal Audit
- Ensuring the Subcontractor following company safety regulation
during working on the project.
Page 4 of 4





